• <thead id="cossc"><mark id="cossc"></mark></thead>
    <optgroup id="cossc"></optgroup>

      <optgroup id="cossc"></optgroup>
        <object id="cossc"></object>
        <optgroup id="cossc"><tt id="cossc"><tr id="cossc"></tr></tt></optgroup>
        <thead id="cossc"><del id="cossc"><video id="cossc"></video></del></thead>
        <thead id="cossc"><mark id="cossc"></mark></thead>
         

        Newsroom

        • Refine:

        For direct media queries please contact:

        E-mail:?Media Relations
        Phone: 519 361 6161

        Sound Monitors up and running in Inverhuron

        2020-07-15

        Sound monitors were deployed in the Inverhuron Community, including locations within Inverhuron Park, and ?Lake Street. In 2019 an external acoustic analysis was conducted, concluding that the silencers installed on the Bruce B dearator vent lines effectively decreased the tonal … Read more


        Bruce B Update

        2020-03-28

        Bruce B Update: Updated – March 30, 2020 On March 28, staff at Bruce B responded to a release of approximately 20 litres of heavy water in Unit 6 which has been shut down since Jan. 17 for Major Component … Read more


        Bruce A Update

        2020-01-30

        On January 30, Bruce A staff discovered a small amount of heavy water on the floor of Unit 2. Station staff followed procedures to allow for safe clean-up, including assembling of Bruce A employees away from the affected area. Unit … Read more


        Bruce A update

        2019-05-07

        On May 6, Bruce A staff discovered a small amount of water from the heat transport system (approximately 200 millilitres, which is less than a pop can) on the floor of Unit 3. Tritium was detected in the area and … Read more


        Bruce B update

        2018-12-07

        Bruce Power continues to monitor the release of mineral oil, which occurred Thursday night when a transformer failed outside Unit 8. The unit was offline for planned maintenance. A mineral oil sheen was observed late this morning in the station’s … Read more


        Bruce B update


        On Dec. 6, a failure of a transformer outside the Unit 8 building at the Bruce B generating station, resulted in a release of mineral oil. The unit was offline for planned maintenance. There is a collection system designed and … Read more


        Bruce B Safety Update

        2018-10-16

        An employee is back to work today after an electrical contact event on Monday, Oct. 15. The employee was conducting welding work on a boiler system during Unit 8 outage activities when they received an electrical contact. The employee left … Read more


        Unit 3 update

        2018-07-25

        Unit 3 was returned to service after a seven-day forced outage.


        Unit 3 update

        2018-07-19

        Unit 3 was removed from service for a forced outage.


        Page 1 of 3
        Medical Isotopes - medical sterilization
        Life-Extension and jobs in the trades
        Electricity market and the price of power
        Bruce Power Life-Extension Project boosting local economy

        Stay in touch

        Sign up for our monthly eNewsletter

        * indicates required
        亚洲欧美中文日韩v在线观看